Our equipments are subjected to testing and commissioning procedures before and after installation as Central Gas System.

Objectives of our commissioning works

(i) To verify proper functioning of the equipment/system after installation; and

(ii) To verify that the performance of the installed equipment/systems meet with the specified design intent through a series of tests and adjustments.

(iii) To capture and record performance data of the whole installation as the baseline for future operation and maintenance.

Commissioning is the advancement of an installation from the stage of static completion to full working conditions and to meet the performance requirements as specified in the General/Particular Specification. This will include setting into operation and regulation of the installation. Fine-tuning of the commissioned system is done to match system performance to the actual needs of the building occupier more closely.

Leave a Reply

XHTML: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>